A machine price on a website is the least useful number in the decision. The same platform is quoted at very different totals depending on what sits inside the number: heads, RIP, installation, training, the first ink set, and freight.

The five blocks

Machine. Heads, bed size and the number of print modules. This is the block most quotes show.

Consumables to start. A first ink set, pretreatment, cleaning solution and spare cappings. Budget for four to six weeks of production, not one bottle.

Freight and clearance. A 600 mm bed machine ships in a crate that needs a forklift at both ends. Sea freight is cheaper, slower, and the customs paperwork is the part that delays delivery.

Installation and training. Someone has to level the machine, set the white ink circulation and teach the first operator. Ask whether that is included or quoted as a day rate.

Running cost. Ink per shirt, pretreatment per shirt, electricity, and the labour minute per piece. This is the block that decides whether the machine pays for itself, and it is usually the block missing from the quote.

What moves the number

Four heads instead of two, a 600 mm bed instead of 400 mm, camera alignment, in-line finishing. Each of those buys throughput or capability, and each adds a line to the invoice. A buyer who cannot say which one they need should not be comparing totals yet.

Questions that change the quote

How many pieces a day, on what fabric, in how many colours, and who fixes it when it stops. A supplier who answers those four in writing is the one to buy from, even at ten per cent more.

What we do differently

We quote the machine and the first consumable set together, because a machine without ink is a crate. We also print your sample before the number goes out, so the quote describes an output rather than a specification sheet.

Ask for a quote with the running cost in it

Send the monthly volume, the fabric and the country. We reply with the machine, the consumables and the freight as separate lines.

Ask about your run